A platform for research: civil engineering, architecture and urbanism
This bridge was first to be built in cantilever from prefabricated segments, with glued joints comprising use of epoxy resin; it includes two identical half-bridges with three bays 37.5, 55, and 37.5 m long, respectively, connected by prestressed concrete floor and fixed on two pile-founded piers; floor is prestressed transversely and longitudinally by means of system of Freyssinet cables; assembly method is described; structure's calculation is presented.
This bridge was first to be built in cantilever from prefabricated segments, with glued joints comprising use of epoxy resin; it includes two identical half-bridges with three bays 37.5, 55, and 37.5 m long, respectively, connected by prestressed concrete floor and fixed on two pile-founded piers; floor is prestressed transversely and longitudinally by means of system of Freyssinet cables; assembly method is described; structure's calculation is presented.
Reconstruction of bridge at Choisy-le-Roi
Reconstruction du pont de Choisy-le-Roi
Mathivat, J. (author)
1966
19 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of Choisy-le Roi railroad bridge in Paris
Engineering Index Backfile | 1946
|Poesia dell'utile . Choisy-le-Roi Bridge - Jacques Ferrier Architectures
Online Contents | 2011
Histoire de l'architecture / Auguste Choisy ; T. 1
TIBKAT | 1964
|