A platform for research: civil engineering, architecture and urbanism
Municipal water supply problems of Atlanta, Georgia
Supply works consist of 48-in. intake conduit, steam-operated river pumping station with capacity of 106,000,000 gal. per day, pumping against maximum head of 275 ft., through 3 parallel conduits each approximately 18,500 ft. long, into 2 raw-water or settling basins, having combined capacity of 393,000,000 gal.
Municipal water supply problems of Atlanta, Georgia
Supply works consist of 48-in. intake conduit, steam-operated river pumping station with capacity of 106,000,000 gal. per day, pumping against maximum head of 275 ft., through 3 parallel conduits each approximately 18,500 ft. long, into 2 raw-water or settling basins, having combined capacity of 393,000,000 gal.
Municipal water supply problems of Atlanta, Georgia
Am. Soc. Civ. Engrs. -- Proc
Norcross, P.H. (author)
1925
30 pages
13 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Municipal Water Supply Problems of Atlanta, Georgia
ASCE | 2021
|Water Treatment at Atlanta, Georgia
Wiley | 1932
|DeCode-ReCode Atlanta Atlanta, Georgia - Conway + Schulte
Online Contents | 1996
One Peachtree Center Atlanta, Georgia
British Library Conference Proceedings | 1994
|