A platform for research: civil engineering, architecture and urbanism
Construction and operation of the Woltmann recording meter in which main and secondary meters are connected in series, resulting in reducing water losses in Dresden from 30 per cent before its use to 13.7 per cent after its adoption.
Construction and operation of the Woltmann recording meter in which main and secondary meters are connected in series, resulting in reducing water losses in Dresden from 30 per cent before its use to 13.7 per cent after its adoption.
Reducing water losses, especially in large water meters
Die Einschrankung der Wasserverluste insbesondere bei grossen Wassermessern
Gas- und Wasserfach ; 68
1925
6 pages
7 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Conference Proceedings | 2012
|Notes on small flow meters for air, especially orifice meters
TIBKAT | 1921
|Engineering Index Backfile | 1945
|