A platform for research: civil engineering, architecture and urbanism
Reducing steam road crossing failures in Houston Tex.
Special type of bolted crossing being installed on piling to give flexible construction; continuous steam line rail 32 ft. long designed to reduce pounding and consequent failure.
Reducing steam road crossing failures in Houston Tex.
Special type of bolted crossing being installed on piling to give flexible construction; continuous steam line rail 32 ft. long designed to reduce pounding and consequent failure.
Reducing steam road crossing failures in Houston Tex.
Elec. Ry. Jl
Taylor, Jr., W.H. (author)
1925
2 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Road Failures Detection System
Springer Verlag | 2025
|Crossing Fault Lines with Large Diameter Water Pipelines in the Houston Area
British Library Conference Proceedings | 1996
|