A platform for research: civil engineering, architecture and urbanism
Planning and construction of New York central lines' new Hudson river bridge
Channel span of all-riveted type; concrete slab deck on approach viaducts; eliminating secondary stresses; foundations; viaduct superstructure; truss spans. Lond spans erected by progressive cantilever method; staying pile foundations; driving long rivets; known as Alfred H. Smith Memorial bridge. (See also - no. 12, Mar. 19, 1925, pp. 466-474, 11 figs.)
Planning and construction of New York central lines' new Hudson river bridge
Channel span of all-riveted type; concrete slab deck on approach viaducts; eliminating secondary stresses; foundations; viaduct superstructure; truss spans. Lond spans erected by progressive cantilever method; staying pile foundations; driving long rivets; known as Alfred H. Smith Memorial bridge. (See also - no. 12, Mar. 19, 1925, pp. 466-474, 11 figs.)
Planning and construction of New York central lines' new Hudson river bridge
Eng. News-Rec
Welty, H.T. (author)
1925
7 pages
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Planning for Hudson River bridge at New York City
Engineering Index Backfile | 1921
Cable construction on Hudson River bridge
Engineering Index Backfile | 1931
Cable construction on Hudson River bridge
Engineering Index Backfile | 1931
Engineering Index Backfile | 1931
Handling materials for New York bridge across Hudson River
Engineering Index Backfile | 1929