A platform for research: civil engineering, architecture and urbanism
Details of design and construction of new bridge over Niagara River for Michigan Central Railroad Co.; arch span is 3-hinged for all dead load up to and including floor plate and is 2-hinged for balance of dead and for liveload, wind and lateral load, and temperature stresses; braking and secondary stresses. (See also - nos. 4, Apr. 1925, pp. 159-162)
Details of design and construction of new bridge over Niagara River for Michigan Central Railroad Co.; arch span is 3-hinged for all dead load up to and including floor plate and is 2-hinged for balance of dead and for liveload, wind and lateral load, and temperature stresses; braking and secondary stresses. (See also - nos. 4, Apr. 1925, pp. 159-162)
The new Niagara arch bridge
Eng. Jl
Ibsen, H. (author)
1925
6 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1898
Revision of the Niagara Railway Arch Bridge
ASCE | 2021
|The arch bridge over the Niagara rapids
Engineering Index Backfile | 1897
|Rainbow arch bridge over Niagara Gorge -- Symposium
Engineering Index Backfile | 1944
Revision of the Niagara railway arch bridge
Engineering Index Backfile | 1920
|