A platform for research: civil engineering, architecture and urbanism
Demolition of the Linda Vista bridge (California)
Amount of explosives used was 285 lb. of T.N.T. and 80 electric caps; effect on concrete, steel reinforcing rods, and reinforced concrete.
Demolition of the Linda Vista bridge (California)
Amount of explosives used was 285 lb. of T.N.T. and 80 electric caps; effect on concrete, steel reinforcing rods, and reinforced concrete.
Demolition of the Linda Vista bridge (California)
Military Engr
Kramer, H. (author)
1925
3 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The linda vista bridge: A reinforcedconcrete trestle, Pasadena, cal
Engineering Index Backfile | 1909
Bridge demolition breaking hammer and bridge demolition equipment
European Patent Office | 2020
|Engineering Index Backfile | 1940
|