A platform for research: civil engineering, architecture and urbanism
Rebuilding of 2 causeways across southern portion of Lake Scugog, Ontario; field investigations con ducted through shoulders of existing embankments and along 3 parallel lines; soil types encountered, borrow investigations, swamp treatment, and causeway construction; effectiveness of swamp treatment can be attributed to wise selection of new alignment, method of construction, quality of densely graded till material used as backfill, and ideal weather conditions during construction.
Rebuilding of 2 causeways across southern portion of Lake Scugog, Ontario; field investigations con ducted through shoulders of existing embankments and along 3 parallel lines; soil types encountered, borrow investigations, swamp treatment, and causeway construction; effectiveness of swamp treatment can be attributed to wise selection of new alignment, method of construction, quality of densely graded till material used as backfill, and ideal weather conditions during construction.
Construction of port Perry causeway
Canada. Nat Research Council -- Associate Committee Soil Snow Mechanics -- Tech Memo
Wrong, G.A. (author)
1962
14 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of the Galveston causeway
Engineering Index Backfile | 1912
TOMB CONSTRUCTION ALONG THE UNAS CAUSEWAY
British Library Conference Proceedings | 2000
|Engineering Index Backfile | 1945
The construction of the Galveston causeway
Engineering Index Backfile | 1911
Water storage causeway and preloading construction method
European Patent Office | 2020
|