A platform for research: civil engineering, architecture and urbanism
Repairing, strengthening and reconstructing of railway girder bridges
Decision whether to repair or reconstruct bridge involves estimations of remaining life of bridge, future requirements of railway, and probable future value of money; decision whether to repair and strengthen or to reconstruct depends essentially on economics; cost of speed restriction; examination procedure and assessment; modes of failure.
Repairing, strengthening and reconstructing of railway girder bridges
Decision whether to repair or reconstruct bridge involves estimations of remaining life of bridge, future requirements of railway, and probable future value of money; decision whether to repair and strengthen or to reconstruct depends essentially on economics; cost of speed restriction; examination procedure and assessment; modes of failure.
Repairing, strengthening and reconstructing of railway girder bridges
Surveyor
Berridge, P.S.A. (author)
Surveyor ; 122
1963
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Factors governing choice between repairing, strengthening, and reconstructing railway girder bridges
Engineering Index Backfile | 1963
|Strengthening girder bridges on the Madras railway
Engineering Index Backfile | 1907
|Engineering Index Backfile | 1919
|Rolling loads on railway girder bridges
Engineering Index Backfile | 1914
|