A platform for research: civil engineering, architecture and urbanism
Design particulars of new road and railway bridge constructed of reinforced and prestressed concrete; bridge has total length of 1530 ft between abutments; navigable part of river is crossed by twin arched ribs of 629-ft 3-in. span and remaining width of river by similar pair of 544-ft 7 1/2-in. span; procedure of concreting adopted for arches made it possible to use centering to carry only 40% of their weight.
Design particulars of new road and railway bridge constructed of reinforced and prestressed concrete; bridge has total length of 1530 ft between abutments; navigable part of river is crossed by twin arched ribs of 629-ft 3-in. span and remaining width of river by similar pair of 544-ft 7 1/2-in. span; procedure of concreting adopted for arches made it possible to use centering to carry only 40% of their weight.
New bridge over danube in Yugoslavia
Concrete Constr Eng
Zezelj, B. (author)
1963
13 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Maximilian bridge over Danube at Deggendorf
Engineering Index Backfile | 1930
|Landslide along the Danube Bank at Novi Sad, Yugoslavia
British Library Conference Proceedings | 1996
|Bridge over Danube at Hoechstaedt, Germany
Engineering Index Backfile | 1951
|New Bridge over the Danube: Vidin-Calafat
British Library Online Contents | 2014
|