A platform for research: civil engineering, architecture and urbanism
Methods of correction employed in bridge deck repair works at Passaic River Bridge, New Jersey; 3-point repair program includes replacement of seriously damaged slabs and those which indicated incipient failure, experiments with most promising repair techniques for moderately damaged slabs, and search for methods to reduce future spalling.
Methods of correction employed in bridge deck repair works at Passaic River Bridge, New Jersey; 3-point repair program includes replacement of seriously damaged slabs and those which indicated incipient failure, experiments with most promising repair techniques for moderately damaged slabs, and search for methods to reduce future spalling.
Bridge deck repair technique
Pub Works
Riley, O. (author)
Public Works ; 94
1963
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.