A platform for research: civil engineering, architecture and urbanism
Design and construction of 6 steel siphons and other hydraulic structures for diverting 8 cu m of flow of Adige River into FrattaGorzone River, running parallel to it, for purposes of irrigation, flood protection and navigation; total cost of works 3,110,000 lira.
Design and construction of 6 steel siphons and other hydraulic structures for diverting 8 cu m of flow of Adige River into FrattaGorzone River, running parallel to it, for purposes of irrigation, flood protection and navigation; total cost of works 3,110,000 lira.
Una derivazione dall'Adige a Castelbaldo
Una derivazione dall'Adige a Castelbaldo
Cassinis, M. (author)
1938
6 pages
Supplementary plates
Article (Journal)
Italian
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1917
|Una derivazione dall'Adige a Castelbaldo
Engineering Index Backfile | 1938
|