A platform for research: civil engineering, architecture and urbanism
Grande Campata per l'Attraversamento del Po con Una Linen ad Alta Tensione
Design and construction of overhead span, 1050 m long, for Po River crossing of high tension electric line south of Milan, Italy; details of pneumatic foundations of towers about 120 m high; design of anchors.
Grande Campata per l'Attraversamento del Po con Una Linen ad Alta Tensione
Design and construction of overhead span, 1050 m long, for Po River crossing of high tension electric line south of Milan, Italy; details of pneumatic foundations of towers about 120 m high; design of anchors.
Grande Campata per l'Attraversamento del Po con Una Linen ad Alta Tensione
Grande Campata per l'Attraversamento del Po con Una Linen ad Alta Tensione
Barassi, E. (author)
Elettrotecnica ; 25
1938
9 pages
Article (Journal)
Italian
© Metadata Copyright Elsevier B. V. All rights reserved.
Grande Campata per l'Attraversamento del Po con Una Linen ad Alta Tensione
Engineering Index Backfile | 1938
|DOCUMENTO - Alta tensione sulle "basse frequenze"
Online Contents | 2010
|Sostegni doppiamente simmetrici per linee ad alta tensione
UB Braunschweig | 1952
|Eero Saarinen a Yale: intenzioni in tensione
Online Contents | 1999
|