A platform for research: civil engineering, architecture and urbanism
Les fondations des chemins de roulement du nouveau portique de manutention du charbon
Design and construction of reinforced concrete foundations for tracks of coal transporter of Grand-Quevilly steam plant, near Rouen, France; coal transporter weighs 612 metric tons and has capacity of 120 metric tons per hr.
Les fondations des chemins de roulement du nouveau portique de manutention du charbon
Design and construction of reinforced concrete foundations for tracks of coal transporter of Grand-Quevilly steam plant, near Rouen, France; coal transporter weighs 612 metric tons and has capacity of 120 metric tons per hr.
Les fondations des chemins de roulement du nouveau portique de manutention du charbon
Les fondations des chemins de roulement du nouveau portique de manutention du charbon
Lossier, H. (author)
Genie Civil ; 112
1938
5 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Les fondations des chemins de roulement du nouveau portique de manutention du charbon
Engineering Index Backfile | 1938
|