A platform for research: civil engineering, architecture and urbanism
Removal of Fort Moore Hill was necessary to provide reasonably level terrain for Hollywood Parkway; project includes 875,000 cu yd excavation for grading and 4500 cu yd structural excavation; in removal of 11,650 cu yd of brick and concrete masonry from old tunnel, hydraulic Roc-Jak eliminated need for blasting operations; construction stages illustrated.
Removal of Fort Moore Hill was necessary to provide reasonably level terrain for Hollywood Parkway; project includes 875,000 cu yd excavation for grading and 4500 cu yd structural excavation; in removal of 11,650 cu yd of brick and concrete masonry from old tunnel, hydraulic Roc-Jak eliminated need for blasting operations; construction stages illustrated.
Hollywood parkway grading project
Construction News
Dickinson, T.A. (author)
Construction News ; 24
1949
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1949
Engineering Index Backfile | 1940
British Library Online Contents | 2001
|Engineering Index Backfile | 1954
|