A platform for research: civil engineering, architecture and urbanism
How Westcoast crossed rivers
Construction of Westcoast Transmission Co, involved long span crossings over Peace River at Taylor, B.C., (1675-ft clear-span), Fraser River at Flood, (1460-ft clear-span), and over Fraser River near Agassiz; short spans were across Fraser River near Shelley, (1200-ft clear-span) and 500-ft spans across Quesnel and Thompson rivers.
How Westcoast crossed rivers
Construction of Westcoast Transmission Co, involved long span crossings over Peace River at Taylor, B.C., (1675-ft clear-span), Fraser River at Flood, (1460-ft clear-span), and over Fraser River near Agassiz; short spans were across Fraser River near Shelley, (1200-ft clear-span) and 500-ft spans across Quesnel and Thompson rivers.
How Westcoast crossed rivers
Oil Gas J
Oil and Gas Journal ; 56
1958
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Ellen Wohl: Wide Rivers Crossed: the South Platte and the Illinois of the American prairie
Springer Verlag | 2013
|Online Contents | 1998
|Concrete floors with crossed reinforcement
Engineering Index Backfile | 1910
|The complexity of crossed products
British Library Online Contents | 2013
|