A platform for research: civil engineering, architecture and urbanism
Construction of Ackersand II hydroelectric power plant
Hydrology of 381 sq km catchment area; construction of 210,000 cu m equalizing reservoir with intake for 12,128 m long 2.50 m diam headrace pressure tunnel; problem of construction of supporting steelwork in tunnel; fully automatic desanding facility with oil-hydraulic drive; two Pelton turbines with generators of 29,500 kw capacity each.
Construction of Ackersand II hydroelectric power plant
Hydrology of 381 sq km catchment area; construction of 210,000 cu m equalizing reservoir with intake for 12,128 m long 2.50 m diam headrace pressure tunnel; problem of construction of supporting steelwork in tunnel; fully automatic desanding facility with oil-hydraulic drive; two Pelton turbines with generators of 29,500 kw capacity each.
Construction of Ackersand II hydroelectric power plant
Ueber die Bauausfuehrung des Wasserkraftwerkes Ackersand II
Stambach, E. (author)
1959
8 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Krasnoyarsk hydroelectric power plant construction, a new phase of hydroelectric development
Springer Verlag | 1970
Krasnoyarsk hydroelectric power plant construction, a new phase of hydroelectric development
Online Contents | 1970
Construction of the shannon hydroelectric power plant
Engineering Index Backfile | 1928
|