A platform for research: civil engineering, architecture and urbanism
Project consists of number of bridges connecting series of man made islands; many 65-ft and 98-ft prestressed concrete stringer spans, and one 130-ft steel girder span; use of gantry that rides rails atop bridge to hoist prestressed stringers; to set sheetpiles, long rectangular templet supported by spud at each corner is used; top pocket between sheetpile units is grouted; wasting of grout is prevented and tremie operation eliminated by use of plastic "sock".
Project consists of number of bridges connecting series of man made islands; many 65-ft and 98-ft prestressed concrete stringer spans, and one 130-ft steel girder span; use of gantry that rides rails atop bridge to hoist prestressed stringers; to set sheetpiles, long rectangular templet supported by spud at each corner is used; top pocket between sheetpile units is grouted; wasting of grout is prevented and tremie operation eliminated by use of plastic "sock".
Miami causeway sparks innovations
Construction Methods Equipment
Perez, H.T. (author)
1959
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Rickenbacker Causeway -- $6,000,000 project joins Miami with nearby Keys
Engineering Index Backfile | 1947
|Design of the Miami, Florida, causeway across Biscayne Bay
Engineering Index Backfile | 1920
|Engineering Index Backfile | 1945
Engineering Index Backfile | 1909
|Engineering Index Backfile | 1923