A platform for research: civil engineering, architecture and urbanism
Clifton bridge, Nottingham
Prestressed concrete bridge discussed in two related articles, has 275 ft main spans comprising two 87-ft 6-in. cantilevers and 100-ft suspended span; two 125-ft end spans and three 90-ft viaducts; problem of skew discussed. Paper n 6355: Initial design studies and model test. Paper n 6356: Design and construction.
Clifton bridge, Nottingham
Prestressed concrete bridge discussed in two related articles, has 275 ft main spans comprising two 87-ft 6-in. cantilevers and 100-ft suspended span; two 125-ft end spans and three 90-ft viaducts; problem of skew discussed. Paper n 6355: Initial design studies and model test. Paper n 6356: Design and construction.
Clifton bridge, Nottingham
Instn Civ Engrs -- Proc
Finch, R.M. (author) / Goldstein, A. (author)
1959
64 pages
2 Plates
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Progress of Clifton bridge, Nottingham
Engineering Index Backfile | 1957
Progress of Clifton bridge, Nottingham
Engineering Index Backfile | 1957