A platform for research: civil engineering, architecture and urbanism
Temporary bridge shortens Haul
Construction of 370 ft steel plate girder temporary bridge, for one way traffic, on complex earthmoving job to reduce long truck haul to fast moving scraper operation; solution eliminated haul route through heavy traffic and 160,000 truck trips through city streets; steel was obtained from dismounted old highway bridge; spans were designed to utilize given girder length, allowing certain overlappings.
Temporary bridge shortens Haul
Construction of 370 ft steel plate girder temporary bridge, for one way traffic, on complex earthmoving job to reduce long truck haul to fast moving scraper operation; solution eliminated haul route through heavy traffic and 160,000 truck trips through city streets; steel was obtained from dismounted old highway bridge; spans were designed to utilize given girder length, allowing certain overlappings.
Temporary bridge shortens Haul
Construction Methods Equipment
1959
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
JERUSALEM SHORTENS LIBESKINO PYRAMID
British Library Online Contents | 2015
|Moving block signalling shortens headways
British Library Online Contents | 1997
Moving Block Shortens JLE Headway
IuD Bahn | 1997
|