A platform for research: civil engineering, architecture and urbanism
New Orleans tests pumping procedures on lengthy Mississippi river bridge
Bridge from New Orleans to Algiers, La, is 3019 ft in length with central span of 1575 ft; it is not equipped with standpipes for fire protection purposes, which poses both hydraulic and apparatus problems to New Orleans Fire Department; two tests used relays from hydrants near bridge base, third involved water pumped from fire tug which was tied up alongside central river pier.
New Orleans tests pumping procedures on lengthy Mississippi river bridge
Bridge from New Orleans to Algiers, La, is 3019 ft in length with central span of 1575 ft; it is not equipped with standpipes for fire protection purposes, which poses both hydraulic and apparatus problems to New Orleans Fire Department; two tests used relays from hydrants near bridge base, third involved water pumped from fire tug which was tied up alongside central river pier.
New Orleans tests pumping procedures on lengthy Mississippi river bridge
Fire Eng
Fire Engineering ; 111
1958
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1960
Redecking and Strengthening of the Greater New Orleans Mississippi River Bridge
British Library Conference Proceedings | 1992
|Report on construction of steel truss bridge over Mississippi River near New Orleans
Engineering Index Backfile | 1936
|New Orleans and the harbor of the Mississippi River
Engineering Index Backfile | 1929
|Lengthy, candid talks result in successful river crossing
Online Contents | 1997
|