A platform for research: civil engineering, architecture and urbanism
Extension of Orly airport, including two runways of 3300 mm each, new hangar, 2400-kva power plant, and welded steel terminal building 600 m long designed for handling 4 million passengers and eventually 6, 000,000 annually; construction details of bridges and underpasses. See also Engineering Index 1957 p 61.
Extension of Orly airport, including two runways of 3300 mm each, new hangar, 2400-kva power plant, and welded steel terminal building 600 m long designed for handling 4 million passengers and eventually 6, 000,000 annually; construction details of bridges and underpasses. See also Engineering Index 1957 p 61.
L'extension de l'aeroport D'orly
L'extension de l'aeroport D'orly
Mondin, C. (author)
Construction ; 13
1958
7 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1939
|International: Algérie. Egis aménage l'aéroport d'Oran
Online Contents | 2010
Retour des EPA : l'exemple d'Orly-Rungis-Seine Amont
Online Contents | 2009
|Terminal de l'aeroport de Barajas, Madrid (Espagne)
British Library Online Contents | 2006
|La noblesse du vol L'aeroport Berlin-Tempelhof
British Library Online Contents | 2002
|