A platform for research: civil engineering, architecture and urbanism
Water supply for Yeovil district (Sutton Bingham scheme)
Scheme is based on impounding reservoir constructed on Forest Marble division of Jurassic formation, overlain by limestone which necessitated deep cut-off trench and extensive pressure grouting; air entrained concrete was pumped to trench, overflow, and river diversion works; pore pressure measurements were taken in embankment during construction and impounding; pumping and water treatment plant.
Water supply for Yeovil district (Sutton Bingham scheme)
Scheme is based on impounding reservoir constructed on Forest Marble division of Jurassic formation, overlain by limestone which necessitated deep cut-off trench and extensive pressure grouting; air entrained concrete was pumped to trench, overflow, and river diversion works; pore pressure measurements were taken in embankment during construction and impounding; pumping and water treatment plant.
Water supply for Yeovil district (Sutton Bingham scheme)
Instn Civ Engrs -- Proc
Walters, R.C.S. (author) / Walton, R.J.C. (author)
1957
22 pages
6 Plates
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Sutton Bingham Reservoir sedimentation study
British Library Conference Proceedings | 2010
|Slope instability and remedial works at Sutton Bingham reservoir
British Library Conference Proceedings | 2009
|Online Contents | 2012