A platform for research: civil engineering, architecture and urbanism
Usk scheme for water supply of Swansea
Earth dam situated at upper reaches of Usk River, 1575 ft long at crest level, 109 ft high, impounds 2700 million gal; compensation water is conveyed through diversion tunnel under embankment; valve tower, having three drawoffs, controls water supply from reservoir; water enters concrete lined supply tunnel 1 1/2 mi long, driven under mountain, and is carried to Swansea through 33 mi of steel pipes. (See also - discussion p266-74,2 plates)
Usk scheme for water supply of Swansea
Earth dam situated at upper reaches of Usk River, 1575 ft long at crest level, 109 ft high, impounds 2700 million gal; compensation water is conveyed through diversion tunnel under embankment; valve tower, having three drawoffs, controls water supply from reservoir; water enters concrete lined supply tunnel 1 1/2 mi long, driven under mountain, and is carried to Swansea through 33 mi of steel pipes. (See also - discussion p266-74,2 plates)
Usk scheme for water supply of Swansea
Instn Civ Engrs -- Proc
Sheppard, G.A.R. (author) / Aylen, L.B. (author)
1957
20 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Elsevier | 2005
|Online Contents | 2005
Elsevier | 2004
|British Library Online Contents | 2004
|Engineering Index Backfile | 1936