A platform for research: civil engineering, architecture and urbanism
Glen Canyon diversion
Drilling 2778 ft diversion tunnel through west wall of Glen Canyon, Ariz is described; specifications call for 1818 ft of unlined tunnel 43 ft 6 in. in diam and 950 ft of unlined tunnel 46 ft 6 in. in diam; tunnel to be completed within 400 working days; access is major problem with men and equipment lowered by cableway.
Glen Canyon diversion
Drilling 2778 ft diversion tunnel through west wall of Glen Canyon, Ariz is described; specifications call for 1818 ft of unlined tunnel 43 ft 6 in. in diam and 950 ft of unlined tunnel 46 ft 6 in. in diam; tunnel to be completed within 400 working days; access is major problem with men and equipment lowered by cableway.
Glen Canyon diversion
Western Construction
Western Construction ; 32
1957
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Glen Canyon Dam Diversion Tunnel Outlets
ASCE | 2021
|Closure to “Glen Canyon Dam Diversion Tunnel Outlets”
ASCE | 2021
|Discussion of “Glen Canyon Dam Diversion Tunnel Outlets”
ASCE | 2021
|NTIS | 2006
|Engineering Index Backfile | 1961
|