A platform for research: civil engineering, architecture and urbanism
Apr n 610 p 421-3: Area reclaimed for Connah's Quay power station was 70 acres and consisted in constructing embankments to height of 22 ft to enclose site; stripping top soil, etc. May n 611 p 565-7: Sand pumping and building foundations. June n 612 p 669-70: River intake works; description of main superstructure.
Apr n 610 p 421-3: Area reclaimed for Connah's Quay power station was 70 acres and consisted in constructing embankments to height of 22 ft to enclose site; stripping top soil, etc. May n 611 p 565-7: Sand pumping and building foundations. June n 612 p 669-70: River intake works; description of main superstructure.
Site reclamation and construction work
Civ Eng (Lond)
Evans, F.W. (author)
Civil Engineering ; 52
1957
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction Innovations in Reclamation Work
ASCE | 2021
|Construction work on federal reclamation project
Engineering Index Backfile | 1932
|Construction work on federal reclamation project
Engineering Index Backfile | 1931
|Construction work on federal reclamation project
Engineering Index Backfile | 1933
|Construction Work on a Federal Reclamation Project
ASCE | 2021
|