A platform for research: civil engineering, architecture and urbanism
Method of raising high pressure shaft for Breadalbane hydroelectric plant; project involved drilling 6-in. diam hole 600 ft deep through hard igneous rock; details and schematic drawings show method used and steps involved in stoping pilot shaft and enlarging penstock shaft.
Method of raising high pressure shaft for Breadalbane hydroelectric plant; project involved drilling 6-in. diam hole 600 ft deep through hard igneous rock; details and schematic drawings show method used and steps involved in stoping pilot shaft and enlarging penstock shaft.
Shaft raising in Scottish highlands
Instn Civ Engrs -- Proc
Henderson, R.S. (author)
1957
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Hydroelectric developments in Scottish highlands
Engineering Index Backfile | 1965
|Afforestation effects in the Scottish Highlands
Online Contents | 1996
Nord takes up residence in the Scottish Highlands
British Library Online Contents | 2007
Debris flows from the perspective of the Scottish Highlands
British Library Conference Proceedings | 2005
|