A platform for research: civil engineering, architecture and urbanism
Construction on 8 mi of 114-in. outfall sewer; North Central Outfall designed as two separate projects; lower half of line is essentially 20,000 ft tunnel; remaining portion is 8 mi sewer and consists of approximately half tunnel and half open cut construction; tunnel section is designed as monolithic reinforced concrete arch for 2500 psf vertical load and 1000 psf horizontal load.
Construction on 8 mi of 114-in. outfall sewer; North Central Outfall designed as two separate projects; lower half of line is essentially 20,000 ft tunnel; remaining portion is 8 mi sewer and consists of approximately half tunnel and half open cut construction; tunnel section is designed as monolithic reinforced concrete arch for 2500 psf vertical load and 1000 psf horizontal load.
Major new outfall sewer to serve Los Angeles
Pub Works
Kesler, J. (author)
Public Works ; 88
1957
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1947
|Some notes on the Los Angeles outfall sewer
Engineering Index Backfile | 1906
|The completion of the Los Angeles, Cal., outfall sewer
Engineering Index Backfile | 1908
Operation of the Los Angeles outfall sewer and sewerage irrigation
Engineering Index Backfile | 1897
|Engineering Index Backfile | 1940
|