A platform for research: civil engineering, architecture and urbanism
Embankment construction control on AASHO road test
1 1/4 million cu yd of earth were placed in embankment under strict controls; to secure desired uniformity, road test staff set up program necessitating designing and building of special equipment to keep pace with construction machinery; success of control and testing program is evident from fact that few block lifts were rejected; compaction control was better than was expected.
Embankment construction control on AASHO road test
1 1/4 million cu yd of earth were placed in embankment under strict controls; to secure desired uniformity, road test staff set up program necessitating designing and building of special equipment to keep pace with construction machinery; success of control and testing program is evident from fact that few block lifts were rejected; compaction control was better than was expected.
Embankment construction control on AASHO road test
Civ Eng (NY)
Carey, Jr., W.N. (author)
Civil Engineering ; 27
1957
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1962
Engineering Index Backfile | 1962
Engineering Index Backfile | 1960
|Construction Materials Control for the AASHO Road Test
ASCE | 2021
|