A platform for research: civil engineering, architecture and urbanism
Technique used by engineers in Idaho is described; addition of silt filler and cement to crushed gravel produces nonplastic base with high density and high load bearing value; cement content was fixed at 7% by volume; sequence was evolved that gave productions of 3000 ft per day full width of 26 ft in about 8 working hr; machinery used is described.
Technique used by engineers in Idaho is described; addition of silt filler and cement to crushed gravel produces nonplastic base with high density and high load bearing value; cement content was fixed at 7% by volume; sequence was evolved that gave productions of 3000 ft per day full width of 26 ft in about 8 working hr; machinery used is described.
Soil cement stabilization
Pac Bldr Engr
Stowe, J.K. (author)
1957
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Soil stabilization with cement
TIBKAT | 1961
|Engineering Index Backfile | 1939
|Soil stabilization with cement
Engineering Index Backfile | 1955
|Soil-cement stabilization : 6 reports
TIBKAT | 1965
Soil stabilization with Portland Cement
Engineering Index Backfile | 1961