A platform for research: civil engineering, architecture and urbanism
Dredges place highway fill
21-mi section of U S Route 51 in Louisiana requires hydraulic fill obtained from canal and area paralleling present road; new roadway will cover part of old canal which provided borrow for existing road; construction of 3012 ft fixed span high level bridge at Manchac; prestressed, precast, hollow concrete cylinder piles will support bridge; description of dredges used in hydraulic fill construction.
Dredges place highway fill
21-mi section of U S Route 51 in Louisiana requires hydraulic fill obtained from canal and area paralleling present road; new roadway will cover part of old canal which provided borrow for existing road; construction of 3012 ft fixed span high level bridge at Manchac; prestressed, precast, hollow concrete cylinder piles will support bridge; description of dredges used in hydraulic fill construction.
Dredges place highway fill
Excavating Engr
Excavating Engineer ; 51
1957
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Dredges upgrade material as it's placed on fill
Engineering Index Backfile | 1962
|Highway fill pumped into place
Engineering Index Backfile | 1948
Two dredges on single line place roadbed
Engineering Index Backfile | 1965
Engineering Index Backfile | 1912
|Engineering Index Backfile | 1900
|