A platform for research: civil engineering, architecture and urbanism
Difficult wet excavation
Construction problems of Markland-Warsaw Locks and Dam on Ohio River; locks will be constructed and in operation before construction of dam gets under way; two adjacent parallel lock chambers will be located along existing Kentucky shore; upper and lower guard walls will be 1182 and 1060 ft long respectively; particular reference to excavation and earthmoving equipment.
Difficult wet excavation
Construction problems of Markland-Warsaw Locks and Dam on Ohio River; locks will be constructed and in operation before construction of dam gets under way; two adjacent parallel lock chambers will be located along existing Kentucky shore; upper and lower guard walls will be 1182 and 1060 ft long respectively; particular reference to excavation and earthmoving equipment.
Difficult wet excavation
World Construction
World Construction ; 10
1957
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Excavation in difficult ground
Engineering Index Backfile | 1945
|Full face excavation in difficult ground
Wiley | 2014
|Simple Execution of a Difficult Excavation
British Library Conference Proceedings | 1991
|