A platform for research: civil engineering, architecture and urbanism
French dual-purpose scheme; Durance project and Serre Poncon dam
Harnessing of Durance River and problem of smoothing flow for irrigation by creating large reserve; power generation and its effect on maintenance of underground water table discussed together with new technique of artificial enrichment; potential energy of Durance is 10,000 million kw-hr per yr; design and construction of dike, reservoir, and underground power station. (See also - discussion p 564-76)
French dual-purpose scheme; Durance project and Serre Poncon dam
Harnessing of Durance River and problem of smoothing flow for irrigation by creating large reserve; power generation and its effect on maintenance of underground water table discussed together with new technique of artificial enrichment; potential energy of Durance is 10,000 million kw-hr per yr; design and construction of dike, reservoir, and underground power station. (See also - discussion p 564-76)
French dual-purpose scheme; Durance project and Serre Poncon dam
Instn Civ Engrs -- Proc
Giguet, R. (author)
1957
14 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Serre-Poncon dam on Durance river
Engineering Index Backfile | 1955
|Serre-Poncon earth dam on Durance River
Engineering Index Backfile | 1956
|Engineering Index Backfile | 1957
|