A platform for research: civil engineering, architecture and urbanism
New reservoir lining being tested
East Bay Municipal Utility District of Alameda and Contra Costa counties, Calif, is testing new type of reservoir lining designed to lessen construction difficulties, minimize leakage, and reduce costs; lining features very porous "open-graded" asphalt mix.
New reservoir lining being tested
East Bay Municipal Utility District of Alameda and Contra Costa counties, Calif, is testing new type of reservoir lining designed to lessen construction difficulties, minimize leakage, and reduce costs; lining features very porous "open-graded" asphalt mix.
New reservoir lining being tested
Western Construction
Western Construction ; 32
1957
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1938
|Engineering Index Backfile | 1938
|Engineering Index Backfile | 1942
|Re‐Lining the Verona Reservoir
Wiley | 1926
|