A platform for research: civil engineering, architecture and urbanism
Site preloading eliminates piles for two oil storage tanks
Foundation treatment for oil storage tanks 120 ft in diam and 60 ft high at Chelsea, Mass; site preloading operation carried out for less than half cost of pile foundation; soil engineering investigation for design and control of site preloading.
Site preloading eliminates piles for two oil storage tanks
Foundation treatment for oil storage tanks 120 ft in diam and 60 ft high at Chelsea, Mass; site preloading operation carried out for less than half cost of pile foundation; soil engineering investigation for design and control of site preloading.
Site preloading eliminates piles for two oil storage tanks
Boston Soc Civ Engrs -- J
Aldrich, Jr., H.P. (author)
1957
20 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Preloading Wastewater Treatment Plant Tanks 7.46
British Library Conference Proceedings | 1993
|Preloading of structural piles and pile groups
British Library Conference Proceedings | 1999
|Bored piles with base preloading by grouting - the Polish experience
British Library Conference Proceedings | 2006
|Analysis of Lateral Loads on Piles Supporting Liquid Storage Tanks
Springer Verlag | 2021
|