A platform for research: civil engineering, architecture and urbanism
New method of lining tunnels
Use of shuttering forms with loose section for concrete lining in tunnels of South African mines; forms are complete oblong shell of fabricated steel, 6 ft × 6 ft in section and 12 ft long and supported by two steel beams to which rubber treaded wheels are fitted.
New method of lining tunnels
Use of shuttering forms with loose section for concrete lining in tunnels of South African mines; forms are complete oblong shell of fabricated steel, 6 ft × 6 ft in section and 12 ft long and supported by two steel beams to which rubber treaded wheels are fitted.
New method of lining tunnels
Min J (Lond)
Mining Journal ; 248
1957
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Rapid method of lining tunnels
Engineering Index Backfile | 1952
|"Pretub" method for lining circular tunnels
Engineering Index Backfile | 1959
|Construction of lining for tunnels
Engineering Index Backfile | 1955
|Dams, Canals and Tunnels Lining
British Library Conference Proceedings | 1998
|Modern methods of lining tunnels
Engineering Index Backfile | 1965
|