A platform for research: civil engineering, architecture and urbanism
High-speed erection of cosmetics factory
Factory at Eastleigh, Great Britain built in 12 mo; structural concrete was chosen for frame of all buildings and all members were precast to speed erection; factory consists of single story warehouse, two story manufacturing block, and single story office and canteen building.
High-speed erection of cosmetics factory
Factory at Eastleigh, Great Britain built in 12 mo; structural concrete was chosen for frame of all buildings and all members were precast to speed erection; factory consists of single story warehouse, two story manufacturing block, and single story office and canteen building.
High-speed erection of cosmetics factory
Civ Structural Engrs Rev
1957
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1952
Assembly-line precasting, erection yield 10,000 sq ft of factory daily
Engineering Index Backfile | 1953
|Erection of a reinforced concrete factory for the Bush terminal company
Engineering Index Backfile | 1906
Electro-hydraulic control of high-speed segment erection processes
British Library Online Contents | 2017
|Electro-hydraulic control of high-speed segment erection processes
Online Contents | 2016
|