A platform for research: civil engineering, architecture and urbanism
Dam and power plant of El Aroussia on Medjerda river, Tunisia
Dam is concrete gravity type, 45 m in length; power plant has 4800 kva generator group; other purpose of dam is irrigation of 50,000 ha.
Dam and power plant of El Aroussia on Medjerda river, Tunisia
Dam is concrete gravity type, 45 m in length; power plant has 4800 kva generator group; other purpose of dam is irrigation of 50,000 ha.
Dam and power plant of El Aroussia on Medjerda river, Tunisia
Le barrage et l'usine d'El Aroussia sur la Medjerda
Herve, J. (author) / Apertet, J. (author)
1957
14 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Flood routing of regulated flows in Medjerda River, Tunisia
British Library Online Contents | 2005
|Environmental impact of mining activity on the pollution of the Medjerda River, north-west Tunisia
Online Contents | 1999
|