A platform for research: civil engineering, architecture and urbanism
Glen Shira Scheme
Project will be capable of generating 80 million kw-hr per annum; main reservoir has top water level of 1108 ft and storage capacity of 750 MMcf; upper dam is round head buttress type 2250 ft long and has max height of 133 ft; lower dam is concrete gravity structure incorporating spillway; underground generating station at Clachan is equipped with single 56,000-hp 428-rpm Francis turbine, coupled to 40-Mw generator. (See also - n 1 Jan 1957 p 4-12)
Glen Shira Scheme
Project will be capable of generating 80 million kw-hr per annum; main reservoir has top water level of 1108 ft and storage capacity of 750 MMcf; upper dam is round head buttress type 2250 ft long and has max height of 133 ft; lower dam is concrete gravity structure incorporating spillway; underground generating station at Clachan is equipped with single 56,000-hp 428-rpm Francis turbine, coupled to 40-Mw generator. (See also - n 1 Jan 1957 p 4-12)
Glen Shira Scheme
Water Power
Water Power ; 9
1957
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1957
|Glen Shira hydro-electric project
Engineering Index Backfile | 1956
|Seismic evaluation of Shira main dam
British Library Conference Proceedings | 2002
|Online Contents | 2016
SHIRA Wave, current and seabed information from standard navigational radar
British Library Online Contents | 2000