A platform for research: civil engineering, architecture and urbanism
Speedy Work on Spokane Freeway
5-mi stretch of completed portion of new freeway extends east from Spokane city limits; freeway includes two 24-ft wide pavements capable of handling two traffic lanes each; 36 to 40-ft division between traffic pavements; 4-ft shoulder on inside plus 10-ft shoulder on outside; pavement includes 2-in. thick stone surfacing top course on gravel subgrade; 6-in. cement treated base layer is 25 ft wide; 3 in. of asphaltic concrete is laid in 2 layers, each 1 1/2 in. thick.
Speedy Work on Spokane Freeway
5-mi stretch of completed portion of new freeway extends east from Spokane city limits; freeway includes two 24-ft wide pavements capable of handling two traffic lanes each; 36 to 40-ft division between traffic pavements; 4-ft shoulder on inside plus 10-ft shoulder on outside; pavement includes 2-in. thick stone surfacing top course on gravel subgrade; 6-in. cement treated base layer is 25 ft wide; 3 in. of asphaltic concrete is laid in 2 layers, each 1 1/2 in. thick.
Speedy Work on Spokane Freeway
Eng News-Rec
1957
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
North Spokane Freeway - Environmental Process
British Library Conference Proceedings | 1996
|NTIS | 1998
|Street lighting experiment in Spokane
Engineering Index Backfile | 1945
|UPRIVER DAM FAILURE, SPOKANE RIVER, 1986
British Library Conference Proceedings | 2016
|