A platform for research: civil engineering, architecture and urbanism
Oregon builds sidehill highway
Alignment is located 20 to 35 ft above existing highway on talus slope of about 1:1; to minimize interference to traffic job is being constructed in planned stages; first step is to build roadway; shoulder is widened by building up embankment in compacted lifts; bench wide enough for one lane of traffic is excavated 20 to 35 ft above old grade.
Oregon builds sidehill highway
Alignment is located 20 to 35 ft above existing highway on talus slope of about 1:1; to minimize interference to traffic job is being constructed in planned stages; first step is to build roadway; shoulder is widened by building up embankment in compacted lifts; bench wide enough for one lane of traffic is excavated 20 to 35 ft above old grade.
Oregon builds sidehill highway
Western Construction
Western Construction ; 32
1957
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1946
|How Oregon builds cement stabilized base
Engineering Index Backfile | 1941
|Brazil Builds Its Biggest Highway
Engineering Index Backfile | 1950
Michigan builds first military highway
Engineering Index Backfile | 1941
|Oregon builds cement bound Macadam test road
Engineering Index Backfile | 1935