A platform for research: civil engineering, architecture and urbanism
Planning and construction of first four units of Ohio Edison Co's 700 Mw Stratton Station; simultaneous construction of Corp of Engineers New Cumberland locks and dams and Ohio's improvement to Route 7 required much joint planning and coordination to utilize narrow river valley at this locale; 4 turbine-generators have gross output of 185,000 kw each; triple flow type machines are designed for 2400 psig, 1050 F initial and 1000 F reheat steam conditions.
Planning and construction of first four units of Ohio Edison Co's 700 Mw Stratton Station; simultaneous construction of Corp of Engineers New Cumberland locks and dams and Ohio's improvement to Route 7 required much joint planning and coordination to utilize narrow river valley at this locale; 4 turbine-generators have gross output of 185,000 kw each; triple flow type machines are designed for 2400 psig, 1050 F initial and 1000 F reheat steam conditions.
Stratton steam electric station
ASCE -- Proc (J Power Div)
Alban, C.H. (author)
1959
15 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Closure to “Stratton on Panama Canal”
ASCE | 2021
|Closure to “Stratton on Panama Canal”
ASCE | 2021
|The pictorial art of Mr. Fred Stratton
DataCite | 1914
|The Yeh-Stratton Criterion for Composite Materials
British Library Online Contents | 1994
|The pictorial art of Mr. Fred Stratton
DataCite | 1914
|