A platform for research: civil engineering, architecture and urbanism
Sanitary considerations of five-mile ocean outfall
Discussion of engineering considerations which led to construction of submarine outfall of Los Angeles, Calif, Hyperion plant; results of general as well as specific studies are presented; oceanographic considerations; testing of pollutant propagation and bacterial performance in ocean water and on beaches; requirements on design of outfall and diffuser; operation of outfall, in use since Mar 1961, proved satisfactory.
Sanitary considerations of five-mile ocean outfall
Discussion of engineering considerations which led to construction of submarine outfall of Los Angeles, Calif, Hyperion plant; results of general as well as specific studies are presented; oceanographic considerations; testing of pollutant propagation and bacterial performance in ocean water and on beaches; requirements on design of outfall and diffuser; operation of outfall, in use since Mar 1961, proved satisfactory.
Sanitary considerations of five-mile ocean outfall
ASCE -- Proc (J Sanitary Eng Div)
Lawrance, C.H. (author)
1961
32 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Sanitary Considerations of Five-Mile Ocean Outfall
ASCE | 2021
|Operation of 7-mile digested sludge outfall
Engineering Index Backfile | 1959
|Operation of a 7-Mile Digested Sludge Outfall
ASCE | 2021
|Three-mile outfall sewer laid below harbor bottom
Engineering Index Backfile | 1929
Hyperion Treatment Plant 5-Mile Outfall Re-ballasting Project
British Library Conference Proceedings | 2011
|