A platform for research: civil engineering, architecture and urbanism
Underpass solves traffic congestion at busy Montreal intersection
Construction details of $1,069,027 grade separation project in Montreal, Canada; Berri Street overpass was constructed in two stages and for open cut excavation steel sheet piling was driven; underpass has two 28-ft lanes separated by 6 ft median strip and is lighted by luminaires placed at 100 ft intervals with neon line lighting underneath overpass.
Underpass solves traffic congestion at busy Montreal intersection
Construction details of $1,069,027 grade separation project in Montreal, Canada; Berri Street overpass was constructed in two stages and for open cut excavation steel sheet piling was driven; underpass has two 28-ft lanes separated by 6 ft median strip and is lighted by luminaires placed at 100 ft intervals with neon line lighting underneath overpass.
Underpass solves traffic congestion at busy Montreal intersection
Roads Eng Construction
1960
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
UNDERPASS MONITORING SYSTEM, UNDERPASS MONITORING DEVICE, AND UNDERPASS MONITORING METHOD
European Patent Office | 2016
|British Library Online Contents | 2004
|Engineering Index Backfile | 1953