A platform for research: civil engineering, architecture and urbanism
Sequence of construction, use of jacks, control, lifting rods, collars, columns, and costs of method which consists of constructing floors and floor assemblies on ground, one on top of other, then lifting and fixing them into place to form normal structure.
Sequence of construction, use of jacks, control, lifting rods, collars, columns, and costs of method which consists of constructing floors and floor assemblies on ground, one on top of other, then lifting and fixing them into place to form normal structure.
Lift slab construction
Roads Eng Construction
Sefton, W.V. (author)
1960
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1998
Engineering Index Backfile | 1964
|Multistory lift-slab construction
Engineering Index Backfile | 1958
|British Library Conference Proceedings | 1997
|Lift-slab construction in Japan
Engineering Index Backfile | 1967
|