A platform for research: civil engineering, architecture and urbanism
Problems of overall survey for bridge, having length of some 24 mi over open water; control measures used prior to construction consisted of various forms of triangulation; alignment and stationing during construction were attained through use of towers, repetitive measurements, ingeniously designed templates, and other adjustable positioning devices.
Problems of overall survey for bridge, having length of some 24 mi over open water; control measures used prior to construction consisted of various forms of triangulation; alignment and stationing during construction were attained through use of towers, repetitive measurements, ingeniously designed templates, and other adjustable positioning devices.
Surveys for lake Pontchartrain Bridge
ASCE -- Proc (J Surveying Mapping Div)
Tuttle, J.M. (author)
1961
12 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Surveys for the Lake Pontchartrain Bridge
ASCE | 2021
|Concrete bridge across Lake Pontchartrain
Engineering Index Backfile | 1961
|$5,500,000 bridge completed across lake pontchartrain
Engineering Index Backfile | 1928
ASCE | 2018
|Longest vehicular bridge starts across Lake Pontchartrain
Engineering Index Backfile | 1955
|