A platform for research: civil engineering, architecture and urbanism
Hydroelectric development of Noguera Ribagorzana river basin
Project comprises 12 dams, with total heads ranging from 72 m to 483 m and total output of 318,000 kw; five additional dams will bring output of Ribagorzana basin to 387,000-kw; electric network will be interconnected with other Spanish networks as well as with Electricite de France networks; description of six most important dams and their power plants.
Hydroelectric development of Noguera Ribagorzana river basin
Project comprises 12 dams, with total heads ranging from 72 m to 483 m and total output of 318,000 kw; five additional dams will bring output of Ribagorzana basin to 387,000-kw; electric network will be interconnected with other Spanish networks as well as with Electricite de France networks; description of six most important dams and their power plants.
Hydroelectric development of Noguera Ribagorzana river basin
L'amenagement hydroelectrique du Noguera Ribagorzana
Rodriguez, G. (author)
Genie Civil ; 143
1966
8 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Barrage dam of Camarasa hydroelectric plant at Noguera Pallaresa, Spain
Engineering Index Backfile | 1926
|The Bureya River hydroelectric development
Online Contents | 1977
|The Bureya River hydroelectric development
Springer Verlag | 1977
|Rhein River hydroelectric development at Kembs
Engineering Index Backfile | 1929
|Exploratory adit for Niagara River Hydroelectric Development
Online Contents | 1995
|