A platform for research: civil engineering, architecture and urbanism
Rescuing Abu Simbel Temples; to save temples from Nile waters rising as consequence of construction of new High Dam near Aswan, these temples are sawn into blocks weighing up to 30 tons, moved to new site and reassembled there; derrick cranes of 30 megapond lifting capacity and 30 m radius are included in handling equipment used.
Rescuing Abu Simbel Temples; to save temples from Nile waters rising as consequence of construction of new High Dam near Aswan, these temples are sawn into blocks weighing up to 30 tons, moved to new site and reassembled there; derrick cranes of 30 megapond lifting capacity and 30 m radius are included in handling equipment used.
Rettung der Tempel von Abu Simbel
Rettung der Tempel von Abu Simbel
Maas, H.A. (author)
Foerdern und Heben ; 18
1968
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Felsentempel des König Ramses II. und kleiner Tempel der Nefertari, Abu Simbel
DataCite | 2020
|Felsentempel des König Ramses II. und kleiner Tempel der Nefertari, Abu Simbel
DataCite | 2020
|Unternehmen Pharao : die Rettung der ägyptischen Tempel
UB Braunschweig | 1978
|Unternehmen Pharao : die Rettung der ägyptischen Tempel
TIBKAT | 1978
|