Bridge repair in Seattle
Technique used to repair 150 columns of 40-yr-old bridge without disrupting traffic on overhead roadway is described; high water-table fed by spanned Duwamish River complicated project; repair of columns was done by replacing rotted portions of pilings with mass concrete pile cap between footing bottom and sound wood below permanent water-table; columns had to be jacked to transfer load from pilings to temporary support structure.
Bridge repair in Seattle
Technique used to repair 150 columns of 40-yr-old bridge without disrupting traffic on overhead roadway is described; high water-table fed by spanned Duwamish River complicated project; repair of columns was done by replacing rotted portions of pilings with mass concrete pile cap between footing bottom and sound wood below permanent water-table; columns had to be jacked to transfer load from pilings to temporary support structure.
Bridge repair in Seattle
Western Construction
Western Construction ; 43
1968
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Lake union bridge, Seattle, Washington
Engineering Index Backfile | 1930
Bridge Seismic Retrofits in Seattle
British Library Conference Proceedings | 1999
|Fourteenth avenue south bridge, Seattle
Engineering Index Backfile | 1931
|Decommissioning of SR520 Floating Bridge, Seattle, WA
TIBKAT | 2019
|Decommissioning of SR520 Floating Bridge, Seattle, WA
ASCE | 2019
|