A platform for research: civil engineering, architecture and urbanism
Extensions to water mains and sewers; review of construction on contract No 9; connection of existing No 2 main sewer and No 3 main sewer under construction; auxiliary work in Avellaneda, Province of Buenos Aires.
Extensions to water mains and sewers; review of construction on contract No 9; connection of existing No 2 main sewer and No 3 main sewer under construction; auxiliary work in Avellaneda, Province of Buenos Aires.
Sanitation of Territory of Federal Capital
Saneamiento del Territorio de la Capital Federal -- Ampliacion de los Servicios de Agua y Cloacas
Soubie, L. (author)
1942
14 pages
Article (Journal)
Spanish
© Metadata Copyright Elsevier B. V. All rights reserved.
Cost Overruns on Federal Capital Territory Authority Road Construction Projects
BASE | 2019
|Engineering-geology site appraisal of the Federal Capital Territory, Nigeria
Online Contents | 1985
|Engineering-geology site appraisal of the Federal Capital Territory, Nigeria
Online Contents | 1985
|Impact of COVID-19 on Educational Planning in Federal Capital Territory, Abuja, Nigeria.
BASE | 2021
|Mode choice in Nigeria's New Federal Capital Territory: policy and the emergent pattern
British Library Conference Proceedings | 1993
|